Environmental Friendly Production Solution Dyeing TIANAN Textile,Your Best Choice!
   
Your location:Home > News > Company News
Company News

Tianan textile needs to open environmental protection information

AddTime:2021-05-26 09:52:30   Views:     【 Big Mid Small 】   Print   Close

1. Basic information

Company name: hebei tian an textile co., LTD. Xianxian branch
Unified social credit code: 91130929MA0DF95U2E
Legal representative: Li Tong
Contact: Feng Dan
Contact: 15227557752
Production address: No. 3, Yanxin Street, Xianxian Economic Development Zone, Cangzhou City, Hebei Province
Product and scale: annual output of interlining fabric 40 million meters
 
 
2. Pollutant emission information
(1) waste:
No. 1 exhaust gas outlet DA001: Particulate matter (ADL: 30 mg/m3), ammonia (ADL: 8.7kg/h), sulfur dioxide (ADL: 200mg/m3), nitrogen oxides (ADL: 300mg/m3), toluene + xylene (ADL: 40mg/m3), non-methane total hydrocarbon (ADL: 40mg/m3) 80mg/m3), Ringmann blackness (permissible limit: Level 1).
DA002: particulate matter (permissible limit: 4.94kg /h, 120mg/m3)
DA003: particulate matter (allowable limit: 4.94kg /h, 120mg/m3)
No. 4 exhaust gas outlet DA004: lampblack: (permissible limit: 2.0mg/m3)
Note: The discharge permit does not require the discharge of waste gas pollutants.
(2) wastewater:
The allowable limit of wastewater is: COD: 380mg/L 8.259t/a, ammonia nitrogen: 35mg/L 0.761t/a, SS: 200mg/L, petroleum: 20mg/L, animal and vegetable oils: 100mg/L, total nitrogen: 45 mg/L 17.955t /a, five days biochemical oxygen demand: 190mg/L.
 
 
3. The environmental protection facility construction and emergency plan filing of the unit
Our unit is equipped with gas collection cover +1 set of lampblack purifier, 3 sets of cyclone dust removal + cloth bag dust remover, 2 sets of canteen lampblack purifier, septic tank, sewage treatment station equipment, environmental protection facilities run normally. The emergency plan has been put on record, the record number is 130929-2020-216-L. Since January 2021, it has not been punished for environmental protection.
 
 
4. EIA Approval Document No. : [2019] No. 146. Acceptance Date: June 18, 2019

Prev:“一带一路”助力传统纺织 新营销模式是“走出去”关键  Next:Letter of commitment of the main body responsible for preventing and controlling environmental pollution by hazardous waste
Back To Top
Home  |  About us  |  Product  |  News  |  Workshop  |  Job  |  Network  |  Message  |  Contact